Social and Civic
We create integrated precast solutions that enhance the unique architecture and design of iconic landmarks and destinations.
Introduction
Optus Stadium
For this project Permacast manufactured up to 25 units per day, working to an accelerated schedule following project award. The progressive design process involved close collaboration between Permacast, the design team, architects, and the client. To support just-in-time delivery, more than 36,000 m² of storage space was utilised. Additionally, Permacast’s BIM modelling was instrumental in maintaining accuracy and efficiency throughout the project, contributing to Optus Stadium’s status as a landmark in modern construction.
Project Overview
Permacast delivered accelerated production of up to 25 units daily, supported by collaborative design, extensive storage, and BIM modelling, ensuring just-in-time delivery and precision for Optus Stadium.
Client
Brookfield Multiplex
Location
Burswood
Duration
2015 – 2016
Industry
Social & Civil
Project Specifications
- 1330 lower bowl precast seating plats
- 827 middle bowl prestressed seating plats
- 1100 upper owl prestressed seating plats
Project Details
- Highly technical project due to the large number of unit types, installation sequence, and program
- 51 different structural types and over 800 unit variations
- Manufactured up to 25 units per day
- Worked to an accelerated program following project award
- Progressive design process with close collaboration between Permacast, designers, architects, and the client
- Utilised over 36,000 m² of storage for just-in-time delivery
- BIM modelling provided by Permacast to ensure accuracy and efficiency
Introduction
Elizabeth Quay
Permacast manufactured a range of polished precast concrete edge seating units for the Elizabeth Quay redevelopment. The seating featured a high-quality finish and was designed to accommodate a variety of radius curves to complement the Quay’s distinctive waterfront design. In total, Permacast produced 104 curved seating units and 199 straight units, each meeting the project’s demanding aesthetic and structural requirements. The result contributed to the delivery of one of Perth’s most recognisable public spaces, showcasing precision craftsmanship and attention to architectural detail.
Project Overview
Permacast delivered polished precast edge seating for Elizabeth Quay, producing 303 curved and straight units with precision finishes, complex radii, and architectural detailing for Perth’s iconic waterfront.
Client
Denmac Pty Ltd
Location
Perth Waterfront
Duration
2015
Industry
Social & Civil
Project Specifications
- 104 curved seating units
- 199 straight seating units
Project Details
- Met requirements of polished concrete with a high-class finish
- Various radius curves designed to follow the Quay’s irregular shape
- Utilised storage to support just-in-time delivery
- Employed a single pour method, eliminating joints and potential leaks
- Added value by applying anti-graffiti sealing in the yard prior to delivery
