Busselton Jetty

Permacast contributed to the refurbishment of Busselton Jetty by replacing 84 deteriorating concrete panels with new precast units, expertly manufactured to meet strict specifications.

Introduction

Permacast was selected by the head contractor, Shorewater Marine, to manufacture 84 precast concrete panels to replace the existing deteriorating panels on the Busselton Jetty. To meet stringent specifications, these panels were produced in a highly controlled precast factory environment. This included achieving a consistent anti-slip concrete finish and additional reinforcement cover to ensure safety and durability in a marine environment. Due to the panels’ delicate geometry and shallow depth, lifting and transportation were completed carefully to prevent damage and maintain its structural integrity.

Client

Shorewater Marine

Location

Busselton

Duration

2025

Industry

Marine

Project Specifications

  • 84 precast concrete panels, each measuring 4000x740x130mm

Project Details

  • Expertly engineered panels meeting precise specifications to ensure durability in a marine setting
  • Achieved anti-slip concrete finish for all panels
  • Managed careful, just-in-time delivery of delicate panels to prevent damage